The Process

A journey in five acts

From the first idea to handing over the keys: every phase is planned, controlled and guaranteed.

  1. Design
    012–4 weeks

    Design

    The project begins with listening. We analyse the site, your living needs and desired style to develop a tailor-made architectural concept. Every choice — from volumes to finishes — is shared step by step.

  2. Engineering
    022–3 weeks

    Engineering

    Our engineers develop the structural calculations, energy report and executive drawings. Production begins only after the client's written review and approval.

  3. Production
    034–6 weeks

    Production

    In the factory, automated machinery manufactures walls, floors and roof to millimetre precision. Every element is individually checked: spruce frame, rock wool insulation, OSB/3 panels and vapour barriers.

  4. Transportation
    041–2 days

    Transportation

    Logistics are planned to the smallest detail. All elements travel protected by road and arrive on site according to the agreed schedule.

  5. Assembly
    053–10 days

    Assembly

    Our professional team assembles the structure on site: walls, floors, roof, windows and first-fix systems. Installer accommodation costs are covered by us.

Payment terms

60%

Deposit on contract signing

20%

On completion of production

15%

On delivery to site

5%

Balance on completed assembly

Guarantees and certifications

  • Professional liability insurance
  • Ten-year post-completion structural defects policy
  • ISO 9001:2015 certification
  • ISO 45001:2018 certification
  • Certificate of conformity
  • Energy report (ex Legge 10)
  • Systems declaration of conformity