Dimora Elite

Dimora Elite — Modular timber architecture

Builtbefore itarrives

Every building is born in our factory to millimetre tolerances and reaches site already resolved. A4 energy class, timber structure, five real developments underway across Italy.

Scroll
A4 energy class—Structural timber—5 developments underway—±2 mm tolerances—U = 0.16 W/m²K—Made in Italy—A4 energy class—Structural timber—5 developments underway—±2 mm tolerances—U = 0.16 W/m²K—Made in Italy—
Manifesto

The traditional site

is slow, dirty, uncertain.

So we moved it

into the factory.

Walls, floors and roofs are produced under cover, measured to the millimetre and checked one by one. All that is left on site is assembly: a handful of days, no improvisation, no surprises on the invoice.

Timber vs Concrete

Why modular wins

This is not a matter of taste. It is a matter of physics, time and money.

Metric
Modular timber
Traditional site
Production to delivery
40 days
12–18 months
Construction tolerances
± 2 mm
± 20 mm
Energy class
A4
A1 – B
Carbon dioxide
Stored in the structure
Emitted in production
Type of site
Dry, no waiting
Wet, drying times
Final cost
Fixed at contract
Subject to variations
Numbers

0+

Years of experience

0+

Projects completed

0%

Client satisfaction

0d

From production to delivery

Portfolio

Five real developments

Not concepts. Projects in development today across Italy: waterfront, coastal living, healthcare and premium residential.

Advantages

Six reasons, zero compromises

01

Speed

Production, transport and assembly completed within 40 working days of drawing approval.

02

Precision

CNC machinery works the timber to millimetre tolerances that a building site simply cannot hold.

03

Efficiency

An envelope with U = 0.16 W/m²K and 12.7-hour thermal lag: comfort in every season, minimal consumption.

04

Carbon

Structural timber stores CO₂ for the entire life of the building instead of emitting it in production.

05

Healthy living

A dry site, certified natural materials and no residual moisture trapped inside the walls.

06

Certainty

Quantities fixed in design and cost fixed at contract: no surprise variations halfway through.

AI Market Intelligence

The analysis platform reserved for partners and investors.

Invitation only
Process

Five phases, no grey areas

  1. 01

    Design

    2–4 weeks

    We analyse the site, your needs and your style. The architectural concept is tailor-made and shared step by step.

  2. 02

    Engineering

    2–3 weeks

    Structural calculations, energy report and executive drawings. Production starts only after your written approval.

  3. 03

    Production

    4–6 weeks

    In the factory, walls, floors and roof take shape with automated machinery and quality control on every element.

  4. 04

    Transport

    1–2 days

    Logistics planned in detail: elements travel protected and arrive exactly on the agreed schedule.

  5. 05

    Assembly

    3–10 days

    Our team assembles structure, envelope, windows and first-fix systems. The building closes in a matter of days.

Construction standard

What you never see

The same specification on every project, from a single residence to a 54-unit development.

Structure
Spruce timber frame 60×160 mm
Wall insulation
Rock wool 160 mm + EPS 80 mm
Wall U-value
U = 0.16 W/m²K
Thermal lag
12.7 hours
Fire resistance
REI 60 (load-bearing walls)
Windows
Schüco Living 82 mm, Uf = 0.96 W/m²K
Glazing
Triple glazing, Ug = 0.5 W/m²K
Hardware
MACO (Austria)

Guarantees and certifications

  • Ten-year post-completion structural defects policy
  • ISO 9001:2015 certification
  • ISO 45001:2018 certification
  • Energy report (ex Legge 10)
  • Systems declaration of conformity
  • Professional liability insurance
Start here

Your dimora already exists. It just needs building.

A tailor-made design, a clear quote, and a delivery date that actually holds.